|
|
|
Bid:
|
Bid
Opening Date: |
| |
|
|
|
|
| |
Furnish
& place Hot-mix asphalt (HMA) 3C and 13A
|
|
|
08/20/08
@ 1:30 p.m.
|
| |
Annual
Audit RFP
/ Notice
to Bidders
|
|
|
08/29/08
@ 2:00 p.m.
|
| |
Busha
Hwy Project
|
 |
|
08/13/08
@ 2:00 p.m.
|
| |
Bulk
Rock Salt
|
 |
|
03/25/08
@ 1:00 p.m.
|
| |
Bid
for Air Industrial Park Sanitation Forcemain Relocation
|
|
|
06/10/08
@ 1:00 p.m. |
| |
HMA
Crush & Reshape
|
|
|
05/28/08
@ 1:30 p.m. |
| |
North
River Road Sewer Project
|
 |
| |
CSC
Roof Phase II
- Notice
to Bidders
|
|
|
07/10/2008
@ 2:00 p.m. |
| |
2008
Single-Axle Plow Truck
- Notice
to Bidders
|
|
|
07/17/2008
@ 2:00 p.m. |
| |
2008
Tandem-Axle Plow Truck
- Notice
to Bidders
|
|
|
07/17/2008
@ 2:00 p.m. |
| |
|
|
| |
If you are
submitting a bid (1-13 or D-0) you are required to download and submit the
following two documents:
|
|
|
Bidder
Information Sheet
|
|
|
|
|
|
Summary
of Experience
|
|
|
|
| |
Bid
Result Name:
|
|
|
Bid Opening:
|
|
|
|
|
|
|
|
MATERIALS
|
|
|
1.
|
Bituminous
Materials (Not Being Bid)
|
|
|
|
|
2.
|
Bituminous
Mixtures - Hot Mix
|

|
|
01/16/08 @ 1:00 p.m.
|
|
2a.
|
Bituminous
Materials - Cold Patch
|
|
|
01/16/08 @ 1:00 p.m.
|
|
3.
|
Limestone
- Road Commission owned dock
(Marine City)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
3.
|
Limestone
- Private dock
|
|
|
01/16/08 @ 1:00 p.m.
|
|
4.
|
Corrugated
Metal Pipe
|
|
|
01/16/08 @ 1:00 p.m.
|
|
5.
|
Concrete Pipe and Precast (Not
Being Bid)
|
|
|
|
|
6.
|
Sign
Material Requirements (a)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
6.
|
Sign
Material Requirements (b)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
6.
|
Sign
Material Requirements (c)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
7.
|
Painted
Steel Sign Posts
|
|
|
01/16/08 @ 1:00 p.m.
|
|
8.
|
Steel
Beam Guard Rail
|
|
|
(Not Being
Bid, Contract Extended)
|
|
9.
|
Steel
Underbody Scraper Blades - Hardened Steel
|
|
|
01/16/08 @ 1:00 p.m.
|
|
9.
|
Steel
Underbody Scraper Blades - Tungsten Carbide
|
|
|
01/16/08 @ 1:00 p.m.
|
|
10.
|
Traffic Signals (Not Being
Bid)
|
|
|
|
|
11.
|
Fuel
- Diesel (All)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
12.
|
Fuel
- Gasoline (All)
|
|
|
01/16/08 @ 1:00 p.m.
|
|
13.
|
Natural
Aggregate
|
|
|
01/16/08 @ 1:00 p.m.
|
|
|
No
Bid Bonds are required from any service provider.
Performance Bond amounts vary. Please check actual bid
specifications.
NOTICE: Current
service providers have the option of extending their contract
until 12/31/07. Extensions to bids will be posted as they
are approved so please CHECK BACK OFTEN.
|
|
|
SERVICES
|
|
|
|
|
A.
|
Natural Aggregate
|
|
|
01/16/08 @ 1:00 p.m.
|
|
B.
|
Limestone
|
|
|
01/16/08 @ 1:00 p.m.
|
|
C.
|
Pavement Marking, Centerline
& Edgeline
|
|
|
(Not Being
Bid, Contract Extended)
|
|
D.
|
Pavement
Marking, Legends
|
|
|
(Not Being
Bid, Contract Extended)
|
|
E.
|
Curb & Street Sweeping
|
|
|
(Not Being
Bid, Contract Extended)
|
|
F.
|
Contractor
Equipment Rental Services with and without operator, our job site
|
|
|
01/16/08 @ 1:00 p.m.
|
|
G.
|
Catch
Basin Cleaning
|
|
|
01/16/08 @ 1:00 p.m.
|
|
H.
|
Refuse
Container and Disposal
|
|
|
(Not Being
Bid)
|
|
I.
|
Liquid
Calcium Chloride Application & Storage: 21%, 35%, 38%
|
|
|
(Not Being
Bid, Contract Extended)
|
|
J.
|
Signal Maintenance
|
|
|
(Not Being
Bid, Contract Extended)
|
|
K.
|
Chip Seal
|
|
|
(Not Being
Bid, Contract Extended)
|
|
N.
|
Spray Patching
|
|
|
(Not Being
Bid)
|
|
O.
|
Micro Surface
|
|
|
(Not Being
Bid, Contract Extended)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| File
downloads are in PDF format and need Adobe Acrobat Reader.
Please click on the icon to the right to download a copy
if you currently don't have it loaded. |

|
|